Bagged Concrete vs Ready-Mix: Which Is Cheaper?

Codezyra Team•October 10, 2026•7 min read
Home ImprovementConcreteDIY

Related Tool

Concrete Calculator

Try It Free

For most homeowners, bagged concrete is cheaper for jobs under about 1 cubic yard, and ready-mix is cheaper and far easier above that. One cubic yard is 45 bags of 80 lb concrete, which is roughly a 10 x 8 ft slab at 4 inches thick. The exact break-even depends on your local bag price, the ready-mix price per yard and the fixed fees on a small delivery, and you can work it out in a few minutes.

Start by finding your volume with the Concrete Calculator. It shows cubic yards (how ready-mix is sold) and the number of 40, 60 or 80 lb bags (how bagged concrete is sold) side by side.

Why Small Jobs Favor Bags

The two options are priced in completely different ways:

  • Bagged concrete costs the same per bag whether you buy 5 or 50. The total grows in a straight line with the volume.
  • Ready-mix has a price per cubic yard plus fixed charges that hardly change with order size: a delivery charge, and on small orders a short-load fee. Many plants also have a minimum order.
  • On a tiny job, those fixed charges dominate and bags win easily. As the volume grows, the fixed charges are spread over more yards, the bag count climbs, and at some point the truck becomes cheaper. For many US suppliers that crossover lands somewhere around 1 cubic yard, but local pricing can move it in either direction, so get a quote.

    Step 1: Price Bagged Concrete per Cubic Yard

    Multiply your local shelf price by the number of bags in a yard. These counts use the same yields as the calculator: 0.30, 0.45 and 0.60 cu ft for 40, 60 and 80 lb bags.

    Bag size
    Bags per cubic yard
    Bag cost per cubic yard
    40 lb
    90
    bag price × 90
    60 lb
    60
    bag price × 60
    80 lb
    45
    bag price × 45

    For example, if 80 lb bags cost $5, $6, $7 or $8 each where you live, a yard of bagged concrete costs $225, $270, $315 or $360 in material. Bag prices vary widely by region, store and mix type, so use the price you actually see on the shelf. Check the 40 lb price too: small bags often cost more per cubic foot.

    Step 2: Get a Ready-Mix Quote

    Call one or two local ready-mix suppliers and ask for:

  • The price per cubic yard for a standard residential mix.
  • The minimum order, and whether a small order is charged as a full yard.
  • Any short-load fee, and below what volume it applies.
  • The delivery charge, and any fee for extra time spent unloading.
  • Whether they offer weekend delivery, and at what extra cost.
  • Short-load fees and delivery charges are the reason a 1 yard ready-mix order can cost much more per yard than a large one. They vary a lot between suppliers and regions, so compare at least two quotes.

    Step 3: Find Your Break-Even Volume

    Add up the ready-mix fixed fees (delivery, short-load and any minimum-order top-up). Then work out how much more a yard of bags costs than a yard of ready-mix. Divide the first by the second:

    Break-even cubic yards = fixed ready-mix fees ÷ (bag cost per yard − ready-mix price per yard)

    Below that volume, bags are cheaper on material. Above it, ready-mix is. The table shows how the break-even moves with different numbers. These are arithmetic examples, not price quotes:

    Fixed ready-mix fees
    Bags cost $50 more per yard
    Bags cost $100 more per yard
    Bags cost $150 more per yard
    $100
    2 cu yd
    1 cu yd
    0.67 cu yd
    $200
    4 cu yd
    2 cu yd
    1.33 cu yd
    $300
    6 cu yd
    3 cu yd
    2 cu yd

    If bags work out cheaper per yard than the ready-mix price itself, which is rare but possible with a sale, bags win on material at any size, and the decision comes down to labor.

    The Costs That Don't Show Up on the Receipt

    Material price is only part of the comparison. Bags carry costs of their own:

  • Weight. Every cubic yard of bags is 3,600 lb of dry mix, whichever bag size you choose (90 × 40 lb, 60 × 60 lb or 45 × 80 lb). That is more than many pickups are rated to carry in one load, so check the payload rating on your door sticker, or budget for store delivery.
  • Equipment. Mixing more than a few bags by hand is slow. Renting a drum mixer for the day is a common middle option, and it adds a rental fee.
  • Time and help. Every bag has to be lifted, opened, mixed, carried and placed. On a 1 yard slab that is 45 bags of 80 lb, and you need enough people to keep mixing while others place and finish.
  • Consistency. With bags, each batch can come out a little wetter or drier, and if one batch starts to set before the next arrives you get a weak cold joint. Ready-mix arrives as one consistent batch, ready to place all at once.
  • Ready-mix also has its own extras to plan for:

  • Access. The truck must get close to the pour. If it cannot, you need wheelbarrows and helpers or a concrete pump, which is a separate charge.
  • Timing. The concrete has to be placed promptly. Many suppliers aim to discharge within about 90 minutes of batching and charge for extra waiting time, so forms, base and crew must be ready before the truck arrives.
  • Ground damage. A loaded mixer truck is very heavy and can crack a driveway or rut a lawn. Ask where it can safely park.
  • Middle Options Between Bags and a Full Truck

  • Some yards rent small towable mixer trailers that hold a fraction of a yard.
  • Volumetric or mobile mixer trucks mix concrete on site and charge for the amount used, which can suit odd-sized jobs.
  • Splitting a pour, such as doing post holes from bags and the slab from ready-mix, is often the cheapest overall.
  • Quick Guide by Job Size

    Job size
    Approximate 80 lb bags
    Usually best
    Under 0.5 cu yd
    Up to about 23
    Bags
    0.5 to 1 cu yd
    23 to 45
    Bags, or compare quotes
    1 to 2 cu yd
    45 to 90
    Get quotes; ready-mix often wins once labor counts
    Over 2 cu yd
    More than 90
    Ready-mix

    Post holes, fence footings, steps and small landings fall firmly in bag territory. For bag counts by project, see how many bags of concrete you need. A 12 x 12 ft patio at 4 inches is 1.78 cubic yards (80 bags of 80 lb before waste), which is where a quote is worth getting. If you are still deciding thickness, read how thick a concrete slab should be first, because one extra inch adds 25% to a 4 inch slab.

    When to Call a Pro

    Placing and finishing more than a yard or two of concrete before it sets takes practice and a crew. If the job is a driveway, garage floor or anything structural, or the truck cannot reach the site, a concrete contractor may cost less in the end than a slab that has to be torn out. Their quote also usually covers forming, base, reinforcement and finishing.

    The Short Answer

    Under about 1 cubic yard, buy bags. Over about 2 cubic yards, order ready-mix. In between, price a yard of bags (shelf price × 45 for 80 lb bags), get a ready-mix quote with every fee included, and do the break-even sum. Get your volume and bag counts from the Concrete Calculator.

    Ready to try Concrete Calculator?

    Free concrete calculator for slabs, footings, columns, and stairs. Get cubic yards and cubic meters plus 40, 60, and 80 lb bag counts with 10% waste.

    Use Concrete Calculator